Table of Contents
01 Proof-of-Concept Checklist Hardware
This checklist provides a compact Proof-of-Concept workflow for integrating hardware devices with LabVIEW—from wiring and OEM validation to driver use or development, LabVIEW testing, multi-platform deployment (Windows, Linux, Real-Time, FPGA), and executable build.
Scope
This PoC ensures that a device can be correctly connected, tested with OEM tools, accessed via existing or custom LabVIEW drivers, and deployed across supported target systems.
Prerequisites
-
Hardware: device(s), cables, power supplies, measurement tools (multimeter, oscilloscope), any required signal sources.
-
Manuals: Hardware wiring diagram, OEM driver manual, API/SDK, protocol specification.
-
Host systems: Windows, Linux, Real-Time target or RTOS, FPGA target (if applicable).
-
Software: LabVIEW (matching versions for targets), LabVIEW Real-Time / FPGA modules as required, OEM test utilities, driver SDK/headers, compilers/tools for building installers.
-
Accounts/permissions: Admin/root where driver install or udev/systemd changes required.
-
Versioning: Create a PoC folder with versioned names, record serial numbers/firmware versions.
Quick checklist
* Step 0 — Prepare
-
Confirm device model, firmware, and serial number.
-
Read wiring diagram and vendor manual.
-
Create PoC folder and document baseline (HW, SW versions).
* Step 1 — Wiring & Power
-
Wire device per manual or “getting started”! Do NOT wire based on assumptions!
-
Use only proper OEM accessories for power and communication. Do NOT use unverified or miscellaneous cables from storage.
-
Capture a photo of final wiring for documentation and/or to verify with team
-
Verify the infrastructure in between like switches. We do not want to test the infrastructure!
* Step 2 — Hardware Requirements
-
Verify that the hardware configuration on the software side matches the final target hardware (CPU type, OS version, architecture).
-
Check whether the device requires specific CPU performance, number of cores, or real-time capabilities.
-
Confirm required RAM capacity and ensure enough memory headroom for logging, buffers, and parallel tasks.
-
Verify GPU requirements (if relevant), including compute capability or driver versions.
-
Check network interface requirements (e.g., PoE, 1 GbE/2,5 GbE/10 GbE, deterministic Ethernet, static IP support, special chipsets e.g. for cameras).
-
Validate USB requirements such as USB 2.0/3.0 speed, power delivery, bandwidth, and port compatibility.
-
Confirm PCIe version and lane requirements if the device uses expansion cards.
-
Ensure available and correct power supply, including voltage, current, grounding, and isolation requirements.
-
Check if additional peripherals or modules are required (adapters, converters, breakout boards, signal conditioning).
* Step 3 — OEM Software Test
-
Install OEM drivers / utilities (if available).
-
Use OEM app to detect device and perform a basic read/write test.
-
Record OEM results and logs/screenshots.
* Step 4 — LabVIEW Development Environment
-
Confirm LabVIEW version and required toolkits/modules installed.
-
Create minimal LabVIEW VI that opens device, reads/writes, closes device.
-
Add error handling and logging to VI.
-
Unit tests: basic read at minimum sample rate; write test for actuators.
-
Acceptance: VI runs, no communication errors, data reasonable.
-
Record results and logs/screenshots.
* Step 5 — Target Deployment
-
Deploy and test on Real-Time and FPGA targets (if applicable) to verify timing, communication, and stability.
-
Build the application/executable and validate deployment on a clean target system.
-
Acceptance: application runs reliably on all required targets with stable performance.
-
Record results and logs/screenshots.
* Step 6 — Build Executable
-
Build the application/executable and deploy it to a clean target system.
-
Acceptance: application installs and runs correctly in the target environment.
-
Record results and logs/screenshots.
* Step 7 — Stress, Load, & Long-Duration
-
Run throughput / sample-rate tests; check for memory leaks, CPU usage.
-
Run multi-device / concurrency tests (if multiple devices used).
-
Acceptance: no drift, acceptable resource usage, no crashes.
* Step 8 — Regression & Repeatability
-
Reboot, power-cycle and repeat key tests to confirm repeatability.
-
Acceptance: consistent results across cycles.
* Step 9 — Documentation & Handover
-
Attach wiring photos, test logs, build artifacts, troubleshooting notes.
-
Create “how to reproduce” steps and known issues.
-
Sign-off by stakeholders.